Q: If 45 people built 1/2 of a pyramid in 288 days, how many days did it take 65 people to build the next 1/6 of the pyramid, rounded to the nearest integer, assuming each person works at the same constant rate?
As mentioned in the ques. 1/2 of a pyramid has been built and calculate time required to built NEXT 1/6 of the pyramid. Then
NEXT 1/6 of pyramid should be = 1/2*1/6 = 1/12.
(it would be 1/6th of the remaining 1/2 of a pyramid).
But in the solution provided in book, the value taken is 1/6.
Could you please clarify the doubt. (or is it a error in the book).
Thanks!
Saurabh